LABS
Inspected by a laboratory fit-out specialist, the buildings on the campus have been classified as adaptable for several uses. With the possibility for a dry lab, clean room and wet lab (up to CL-3) on the premises, the Connection provides a new opportunity for a business to expand beyond Science Vale UK and give innovation a new address within this internationally renowned area of discovery.
LABS
Inspected by a laboratory fit-out specialist, the buildings on the campus have been classified as adaptable for several uses. With the possibility for a dry lab, clean room and wet lab (up to CL-3) on the premises, the Connection provides a new opportunity for a business to expand beyond Science Vale UK and give innovation a new address within this internationally renowned area of discovery.
Fume extraction routes are ready for use, while slab to slab heights of between 3.38m and 6m provide ample space for equipment.
Electric power from a 1MVA substation serves each building, natural gasconnection is available, and back-up generators provide peace of mind.
A dedicated loading bay and service lift is available for secure deliveries and waste removal.
Specialist gas and hazardous waste storage facilities are possible on-site.
The central atrium and campus hub promote the sharing of ideas and inspiration to power your business.
Slab to slab heights between 3.4m to 5.9m.
Fume extraction routes are ready for use, while slab to slab heights of between 3.38m and 6m provide ample space for equipment.
Electric power from a 1MVA substation serves each building, natural gasconnection is available, and back-up generators provide peace of mind.
A dedicated loading bay and service lift is available for secure deliveries and waste removal.
Specialist gas and hazardous waste storage facilities are possible on-site.
The central atrium and campus hub promote the sharing of ideas and inspiration to power your business.
Slab to slab heights between 3.4m to 5.9m.